We use cookies to provide you with a better experience. By continuing to browse the site you are agreeing to our use of cookies in accordance with our Cookie Policy.
Read on to find out about modulating-condensing boilers, fire-tube heat exchangers, water-tube heat exchangers, hydraulic separation, pumping away/pumping toward, and keeping hydronic systems clean.
If a project seems at financial risk, it’s crucial to evaluate the project and focus on discussing the known risks, challenges and opportunities. Make sure to follow up and ensure the recovery plan is moving forward.
As with any sales opportunity, selling to showroom customers hinges on the experience. That experience is tainted if you don’t have something the customer wants.
A detailed discussion with the owner’s lead grower or cultivation team is the first step in understanding how to properly size and select equipment.
September 5, 2022
Part three of a four-part series on cannabis facilities design. This article describes heating, ventilation, air conditioning and dehumidification systems and air distribution, with a focus on the cultivation side of an indoor facility.
Design quality and model quality are not competing objectives. To achieve quality design, you also must have a quality model.
September 5, 2022
Building information modeling is the preferred design and coordination method for all aspects of construction, including mechanical, electrical and plumbing plans.
Read on for step-by-step instructions on sizing drainage systems, including how to determine the flow rate of boiler effluent and cooling water, as well as the required pipe sizes.