We use cookies to provide you with a better experience. By continuing to browse the site you are agreeing to our use of cookies in accordance with our Cookie Policy.
To maximize the value of school expansion projects, design teams should modernize the systems that support campus operations to meet future maintenance needs and enhance overall performance.
School districts frequently expand existing campuses to accommodate enrollment growth, modern educational programs and aging infrastructure.
How Cordova Electric Cooperative in Cordova, Alaska, used Rheem’s Torin commercial
air-to-water heat pump to transition from fuel oil heating to an electric hydronic solution.
Keeping commercial buildings warm in Cordova, Alaska, is no small task.
Portland International Airport’s chronic grease-management problem became an opportunity to rethink how food-service waste moves through complex terminal infrastructure and to develop a cleaner, more reliable approach suitable for 24/7 operations.
Portland International Airport, owned and operated by the Port of Portland, had a systemic grease problem across its food concessions.
Sized above code and built with redundancy, Fuse at Mason Square shows how plumbing systems can prepare buildings for a wetter, less predictable climate future.
For most plumbing engineers, designing water systems means designing to code.
A high-rise residential building in Battery Park, Manhattan, replaces an aging gas-fired DHW system with a high-efficiency air source heat pump, achieving Local Law 97 compliance and significant energy savings.
The owner of a high-rise multifamily residential building in Battery Park, Manhattan, faced a pressing infrastructure decision: replace an aging, gas-fired domestic hot water (DHW) system that could no longer deliver reliable, efficient service to residents.
New point-of-use design saves labor and costs while improving safety compliance and overall system reliability across 66 school buildings.
Because mixing valves are crucial for preventing scalding, thermal shock and Legionella, the CPS maintenance team required a timely and safe solution to protect students and staff while enhancingwater efficiency.