We use cookies to provide you with a better experience. By continuing to browse the site you are agreeing to our use of cookies in accordance with our Cookie Policy.
A high-rise residential building in Battery Park, Manhattan, replaces an aging gas-fired DHW system with a high-efficiency air source heat pump, achieving Local Law 97 compliance and significant energy savings.
August 3, 2026
The owner of a high-rise multifamily residential building in Battery Park, Manhattan, faced a pressing infrastructure decision: replace an aging, gas-fired domestic hot water (DHW) system that could no longer deliver reliable, efficient service to residents.
New point-of-use design saves labor and costs while improving safety compliance and overall system reliability across 66 school buildings.
July 15, 2026
Because mixing valves are crucial for preventing scalding, thermal shock and Legionella, the CPS maintenance team required a timely and safe solution to protect students and staff while enhancingwater efficiency.
Adding a new backflow preventer to an older system may negatively impact fire protection system performance. Here are some best practices to ensure existing sprinkler systems operate as intended when adding backflow preventers.
Some existing systems were never hydraulically calculated. Some were designed around pipe schedules. Some have little or no remaining safety margin. Add a backflow preventer without understanding the available water supply, system demand and device pressure loss, and a system that once appeared adequate may fail to deliver.
To address aging hospital systems, design teams are using facility condition assessments and carefully phased upgrades to improve reliability while keeping operations running.
July 1, 2026
In a 2025 article in Health Facilities Management titled “Deferred maintenance and master planning,” author Mike Mochel discusses the growing need for organizations to prioritize infrastructure renewal due to building age and systems that are beyond their serviceable life.
Mental health facility replaces a century-old deteriorating steam plant with a state-of-the-art hydronic system, improving comfort, efficiency and care across three campus facilities.
Discover how Eastern State Hospital transformed its century-old infrastructure with a state-of-the-art hydronic retrofit, significantly improving patient comfort and operational efficiency.
This wiring dramatically reduces labor, material and retrofit costs while enabling efficient, scalable
decarbonization for existing buildings and thermal energy networks.
Discover how Class 4 wiring acts as a "secret weapon" for geothermal retrofits by bypassing electrical infrastructure bottlenecks to enable affordable building decarbonization.
Community finds efficient, comfortable alternative to electric resistance fan coils that had always been used to heat various portions of popular facility.