We use cookies to provide you with a better experience. By continuing to browse the site you are agreeing to our use of cookies in accordance with our Cookie Policy.
The company's PIRANHA T15 WET system will be installed in Aura's 21 slope-side residences, powered 100% by renewable energy resources within the residential building.
If possible, mechanical contractors should be involved at the beginning of a mechanical project to provide insight into system design and installation. In this column, learn about selecting a cooling system for an airport hangar based on the client’s wants and needs.
Luxury development “experiences” pluses of PEX plumbing: Reno’s reputation as a gaming hub is well-deserved. For many years, gamblers and fun-seekers have flocked to the northern Nevada city.
The 2023 study shows that clients want larger, multi-functional spaces designed to fit their lifestyle with a focus on storage, wellness amenities and ‘functional’ technology.
Improvements at the Hayward Water Pollution Control Facility are being made to increase capacity, renew infrastructure, and limit nutrient loading to the bay.
Allegiant Stadium, home of the NFL’s Las Vegas Raiders, is equipped with many eco-friendly technologies and products. Read on for a closer look at how it conserves water in its 297 restrooms.
Many restaurants are looking to save money wherever they can; this includes installing energy-efficient water heating equipment. Read on to see Henderson Engineers’ process in determining the right design to satisfy the client.
As Congress passes green energy legislation, the Seattle Kraken’s Climate Pledge Arena showcases many of the technologies that can be used to reduce carbon emissions and recycle as much as possible in a large sports arena.