We use cookies to provide you with a better experience. By continuing to browse the site you are agreeing to our use of cookies in accordance with our Cookie Policy.

logo
  • Engineers & Specifiers
  • Contractors & Installers
  • Wholesalers & Distributors

Follow Us

Newsletter Signups
Manage Subscriptions
  • The Wholesaler
  • Plumbing Engineer
  • PHC News
Newsletter Signups
Manage Subscriptions
  • The Wholesaler
  • Plumbing Engineer
  • PHC News
  • PRODUCTS
    • Bath & Kitchen
    • Fire Protection
    • HVAC
    • Hydronics/Radiant
    • Plumbing
    • PVF
    • Tools
  • PROJECTS
    • Commercial
    • Data Centers
    • Fire Protection
    • Green Building
    • MRO/Retrofit
    • Remodeling
    • Residential
  • HOW TO
    • Design
    • Fire Protection
    • Legal Matters
    • Management
  • BUSINESS
    • AI Technology
    • Associations
    • Buying Groups
    • Technology
  • CODES & STANDARDS
    • ANSI
    • ASHRAE
    • ASSE
    • Regulations
    • Green Building
    • IAPMO
    • ICC
    • NFPA
  • RESOURCES
    • RUGGED MIND AND BODY
    • Media Kit
    • Advertise
    • Contact Us
    • Classifieds
    • Digital Editions
    • Testimonials
    • Subscribe
    • Health & Wellness
    • AHR Expo 2026
  • DIGITAL EDITIONS
Home » Topics » Engineers & Specifiers

Engineers & Specifiers
Engineers & Specifiers RSS Feed RSS

hydronics.jpg
Feature

Air Removal from Hydronic Systems

The challenges presented when gas gets in your system.
March 1, 2022

Hydronic heating and cooling systems that allow air or other gases to enter them do not function well. 


Read More
PE0322_sanitary-sewer-manhole.jpg
Feature

What Happens to Plumbing When the Building Leans? Part 2

A case study of how soil settling caused extensive damage to a new institutional structure.
March 1, 2022
Ron George

In Part 1, published in this magazine’s February 2022 issue, we talked about why buildings lean, how this phenomenon affects plumbing systems and drain lines, and how low-flow fixtures compound this problem.


Read More
Cannabis Grow Facility Design 101, Part 1
Feature

Cannabis Grow Facility Design 101, Part 1

Key infrastructure, process and site considerations on cannabis facilities design.
March 1, 2022

If there is any doubt about the economic viability of cannabis as an agricultural commodity, the Cannabis Business Times lays the notion to rest in a recent report. 


Read More
PE0322_Legionella.jpg
Feature

Safety and Sustainability in Legionella Mitigation, Part 2

The study compared temperature control and continual free chlorine disinfection and their social, sustainable and economic aspects.
March 1, 2022

Back in October 2020, Cory Powers wrote Part 1 of this article, introducing myself, and my Master’s capstone project focusing on one of the hottest topics in the plumbing industry — Legionella


Read More
PE0322_Modular Decon Structure.jpg
Feature

Plumbing Design for Emergency Department Decontamination Areas

Freestanding emergency departments see increased demand as cost pressure shifts care from hospital-based care to outpatient sites.
March 1, 2022
Aaron Bock PE

Emergency departments are a fast-growing health-care market in the United States.


Read More
PE0322_engineer-checking-fire-pump.jpg
FPE Corner

Fire Pump Testing at Less than Maximum Capacity

Code acceptance applies if the water supply pressure exceeds the lowest permissible suction pressure at the maximum sprinkler demand.
March 1, 2022
Christopher Culp, PE, CET

Many plumbing and fire protection professionals are familiar with the basic fire pump design standards and requirements stated in NFPA 20, Standard for the Installation of Stationary Pumps for Fire Protection. 


Read More
PE0322_Nagy-DC Water1.JPG
The Future is Now

Golden Opportunity in Sewers

The technology now exists to make a compelling economic case for sewer energy recovery in almost any municipality.
March 1, 2022
BF Nagy

The Pike’s Peak gold rush in the then-Colorado territory during the late 1850s was the second largest after the California gold rush a decade earlier.


Read More
PE0322_trauma-center.jpg
Collaborative Health Care Design

Simplistic Preliminary Design

To estimate the water needs for your project, you will need to obtain an estimate for what your mechanical engineer needs in makeup water.
March 1, 2022
John Gregory

So, your firm has won the project, and it’s time to start the preliminary plumbing design for the building or buildings.


Read More
PE0322_shower-with-running-water.jpg
Code Classroom

The Importance of Maximum-Temperature Limit Stops

Tub-shower valves with integral maximum-temperature limit stops are code-required in nearly every U.S. building.
March 1, 2022
Ron George

In nearly every building in America, tub-shower valves with integral maximum-temperature limit stops, field-adjusted to limit the maximum setting of the valve to 120 F, are code-required.


Read More
March 1: Deadline to Submit Proposed Changes to 2024 National Standard Plumbing Code

Deadline to Submit Proposed Changes to 2024 National Standard Plumbing Code Extended to April 1

February 28, 2022
Proposals accepted by the technical committee will appear in the 2024 NSPC.
Read More
Previous 1 2 … 231 232 233 234 235 236 237 238 239 … 707 708 Next

Most Popular

  • 5 Reasons Contractors Can’t Miss PHCC CONNECT 2026

  • Mill-Rose John Kirkland Honored With AIM/R 2026 Golden Eagle Award

  • Heat Pump Water Heaters: Tons of Great Tech, but Policy Headwinds

  • The HVAC Equipment Isn’t the Hard Part

Featured Video

Screenshot 2026 08 11 at 9.31.41 am

Instant Insight: Domestic Pressure Boosting Done Right

Subscribe & Learn More

  • Tw09 2026 cover
    Subscribe
  • Pe10 2026 cover
    Subscribe
  • Phc10 2026 cover
    Subscribe
  • Rugged 09 2026
    Learn More

More from PHCP Pros

  • Editorial Team
  • Home
  • Contact Us
  • About
  • Advertise

Follow Us

© 2026 All Rights Reserved

Design, CMS, Hosting & Web Development | ePublishing