We use cookies to provide you with a better experience. By continuing to browse the site you are agreeing to our use of cookies in accordance with our Cookie Policy.
Architects and engineers must coordinate venting/exiting requirements for natural gas equipment and building openings/intakes in the design phase
July 1, 2023
Natural gas-fired and electric boilers and water heaters have specific space and venting requirements to keep building occupants safe. Architects and engineers need to discuss these issues during the design phase to ensure aesthetics and safety issue are all considered.
IAPMO commissioned Arup to analyze and better understand the potential for sustainability savings by using the Water Demand Calculator, an alternative to sizing methods in traditional plumbing codes.
The fully redesigned website offers an immersive and user-friendly experience with a focus on meeting the diverse needs of today’s trade professionals and homeowners.
Imagine waking up to a snowy morning, knowing you won’t have to shovel the sidewalk or driveway. While snowmelt systems are a winter perk, the best time to sell them is in the warmer months. Read on for some tips on selling and installing these systems.