We use cookies to provide you with a better experience. By continuing to browse the site you are agreeing to our use of cookies in accordance with our Cookie Policy.

logo
  • Engineers & Specifiers
  • Contractors & Installers
  • Wholesalers & Distributors
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Free Subscription
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • PRODUCTS
    • Bath & Kitchen
    • Fire Protection
    • HVAC
    • Hydronics/Radiant
    • Plumbing
    • PVF
    • Tools
  • PROJECTS
    • Commercial
    • Green Building
    • MRO/Retrofit
    • Remodeling
    • Residential
  • HOW TO
    • Design
    • Fire Protection
    • Legal Matters
    • Management
  • BUSINESS
    • Buying Groups
    • Technology
    • Associations
  • CODES & STANDARDS
    • ANSI
    • ASHRAE
    • ASSE
    • Regulations
    • Green Building
    • IAPMO
    • ICC
    • NFPA
  • RESOURCES
    • Media Kit
    • Advertise
    • Contact Us
    • Classifieds
    • Digital Editions
    • Behind the Wall
    • Webinars
  • BUYER'S GUIDE
  • DIGITAL EDITIONS
Home » Franklin Electric Expands Production and Warehouse Space in New Olive Branch, Mississippi Facility

Franklin Electric Expands Production and Warehouse Space in New Olive Branch, Mississippi Facility

May 18, 2022
No Comments
Franklin Electric Expands Production and Warehouse Space in New Olive Branch, Mississippi Facility

As a result of continued growth and performance, Franklin Electric has announced the relocation of its Rossville, Tennessee, manufacturing plant operations to Olive Branch, Mississippi. The move marks an expansion in capabilities and inventory with five times the production area, six times the shipping and inventory capacity, and four times the production capacity. The move secures the required space for producing and storing core large vertical lineshaft and submersible turbines, including the FVT Series, the FAF Series Axial Flow, the FMF Series Mixed Flow and the FST Series.

"This updated facility allows us to significantly increase our machining and assembly capacity and capabilities. We will have adequate space to stock the component inventory needed to support our network of certified Franklin Electric Build Centers; we'll also have the capability to fabricate pumps equipped to meet the unique performance requirements of large municipal, mining and other industrial applications," said Mark Heflin, Franklin Electric's vice president of global project management. The expanded production footprint allows Franklin Electric to build any turbine in their product line, including vertical lineshaft turbines up to 42 inches.

The larger building and increased capabilities also allow the company to expand their workforce. The city of Olive Branch is only 30 minutes southwest of Rossville, and all current Franklin Electric associates are anticipated to make the move to the more centrally located facility, with additional hires in production, warehousing, and support staff to follow. The facility manufactures product for the U.S., Canada, Mexico as well as for overseas export.

"The Olive Branch facility marks an important investment in our people, their training and the recruitment of additional talent," said Ryan Johnson, Franklin Electric's vice president of water systems for the Americas. "It reinforces our commitment to upholding Franklin Electric's high quality standards while being attentive and responsive to our customers' needs."

Business Contractors & Installers Engineers & Specifiers Engineering Industry Community News Plumbing Residential Water Conservation Water Quality
  • Related Articles

    Master-Bilt Manufacturing Facility to Close in New Albany, Mississippi

    Milwaukee Tool Starts Construction of New Facility in Grenada, Mississippi

    Armstrong Moves European Production of Circulators to New Expanded Facility in Romania

You must login or register in order to post a comment.

Report Abusive Comment

Most Popular

  • Indoor Ice Rinks: Design Considerations for High-Performance Ice

  • Zurn Water Solutions and Elkay Manufacturing Complete Merger

  • Saniflo USA Donates to Virginia Technical Institute

  • Louisville Water Uncovers Ancient Check Valve Dating Back to the 1870s

Featured Video

Merit video june

Merit Brass Merit Press Technology in Copper & Stainless to Save You Time & Money

Industry Events

  • 09Aug

    PVF Roundtable Q3 Networking Meeting

    Houston , TX
  • 08Sep

    SFPE Forum on Fire Protection Engineering: Challenges in Storage

    Wheeling, IL
  • 11Sep

    IAPMO 93rd Annual Education and Business Conference

    Charlotte, NC
More Events

Subscribe to our newsletters & stay updated

Subscribe & Learn More

  • Tw07 2022 cover
    Learn More
  • Pe07 2022 cover
    Learn More
  • Phc07 2022 cover
    Learn More
  • Es07 2020
    Learn More
Subscribe

More from PHCP Pros

  • Editorial Team
  • Home
  • Contact Us
  • About
  • Advertise

Follow Us

© 2022 All Rights Reserved

Design, CMS, Hosting & Web Development | ePublishing