We use cookies to provide you with a better experience. By continuing to browse the site you are agreeing to our use of cookies in accordance with our Cookie Policy.

logo
  • Engineers & Specifiers
  • Contractors & Installers
  • Wholesalers & Distributors
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Free Subscription
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • PRODUCTS
    • Bath & Kitchen
    • Fire Protection
    • HVAC
    • Hydronics/Radiant
    • Plumbing
    • PVF
    • Tools
  • PROJECTS
    • Commercial
    • Green Building
    • MRO/Retrofit
    • Remodeling
    • Residential
  • HOW TO
    • Design
    • Fire Protection
    • Legal Matters
    • Management
  • BUSINESS
    • Buying Groups
    • Technology
    • Associations
  • CODES & STANDARDS
    • ANSI
    • ASHRAE
    • ASSE
    • Regulations
    • Green Building
    • IAPMO
    • ICC
    • NFPA
  • RESOURCES
    • Media Kit
    • Advertise
    • Contact Us
    • Classifieds
    • Digital Editions
    • Behind the Wall
    • Webinars
    • AHR Live 2023
  • PODCASTS
  • DIGITAL EDITIONS
Home » Lawsuits filed over venting issue at Illinois school

Lawsuits filed over venting issue at Illinois school

September 15, 2015
No Comments
The carbon monoxide leak and exposure resulted in 181 students, faculty and staff being transported to hospitals.

The State-Journal Register reports that five lawsuits have been filed in connection with last September’s carbon monoxide leak at North Mac Intermediate School in Girard, Ill., that sent dozens of students and teachers to the hospital.

Their complaints allege that when a 2003 building addition to the school was designed and constructed, the venting system for the hot water heaters in the mechanical room was defective, causing a modification to be made to the vents that extended the vent pipe high above the roof and required guy wires.

According to documents produced by the school district under the Freedom of Information Act, one of those guy wires to the vent pipe was found after the accident to be broken, according to a press release from the Nolan Law Group.

A district employee and the plumbing/heating contractor had noticed a break in the vent pipe inside the building the week prior to Sept. 15, 2014, and performed a temporary repair that did not hold, the release said.

More details here.

 

Engineers & Specifiers Industry Community News Plumbing
  • Related Articles

    Advocacy Group Gives Pennsylvania 'F' Over Lead in Public School Drinking Water

    Water system blamed in Legionnaires' outbreak at Illinois veterans’ home​

    Legionnaires’ outbreak strikes again at Illinois Vet’s Home

  • Related Products

    Directory Listing - Premium

  • Related Events

    2022 Water Demand Calculator Summit

You must login or register in order to post a comment.

Report Abusive Comment

Most Popular

  • SLB Announces Newmans Valve as NEWCO Valve Supplier for Western Hemisphere

  • Duravit Announces New Hires and Promotions

  • Chicago Plumber’s Union Dyes Chicago River Green for St. Patrick’s Day 2023

  • Peterman Brothers Charity Showdown Supports Indianapolis-Area Community Organizations

Featured Video

Caleffi video thumb

The Gold Standard: Separation with NO Compromise

Industry Events

  • 26Mar

    MCAA 2023 Annual Convention

    Phoenix, AZ
  • 29Mar

    2023 SFPE European Conference & Expo

    Berlin ,
  • 11Apr

    ASA ELEVATE2023

    Charleston, SC
More Events

Subscribe to our newsletters & stay updated

Subscribe & Learn More

  • Tw03 2023 cover
    Learn More
  • Pe03 2023 cover
    Learn More
  • Phc03 2023 cover
    Learn More
  • Es 2022
    Learn More
Subscribe

More from PHCP Pros

  • Editorial Team
  • Home
  • Contact Us
  • About
  • Advertise

Follow Us

© 2023 All Rights Reserved

Design, CMS, Hosting & Web Development | ePublishing